Menu Close

THE ZERO-CAPEX PATHWAY FROM NATURAL GAS TO ELECTRIFIED INDUSTRIAL HEAT

The HeatShift platform successfully and effectively removes the capital, price, and operational barriers to electrifying industrial heat. HeatShift charges during low-price periods, stores as thermal energy, and delivers heat on demand.

HOW IT WORKS

Decouples electricity availability from heat demand — charges during low-price periods, delivers heat when needed.

Wind, Solar PV, Grid (off peak)

INPUT

Low-carbon electricity

Off-peak or negative-price grid power Dedicated PPA or on-site renewables Procurement managed entirely by HeatShift

Electric Heater

Thermal Store (up to 1000°C)

STORAGE

Thermal energy storage

Electric heater converts power to heat Solid or molten medium up to 1000°C+ Oversized input — 8 hrs charge for 24 hrs supply

Heat Exchanger

Steam, Hot Air, Hot Water

OUTPUT

Heat on demand

Seamless integration into existing heat system Steam, hot air or hot water — 100°C to 500°C+ Simultaneous charge & discharge — zero disruption

WHAT CHANGES — AND WHAT DOESN’T

A single Heat-as-a-Service contract replaces a large % of your gas supply
— everything else stays the same.

WHAT YOU GAIN

• Competative cost of heat with gas and carbon counterfactual
• Scope 1 CO₂ eliminated on HaaS volumes from day one
• Zero upfront CAPEX — fully funded by HeatShift
• UK ETS liability reduced

WHAT STAYS THE SAME

• Your downstream heat process — completely unchanged
• No retrofit or equipment replacement needed
• Installed around your schedule — minimal disruption
• Your team operates as normal — zero learning curve

icon6
WHAT YOU STOP DOING

• Paying volatile gas commodity prices
• Carrying UK ETS carbon compliance cost
• Budgeting for gas boiler replacement CAPEX
• Worrying about future carbon regulation

HEATSHIFT FUNDS, OWNS, AND OPERATES THE FULL SYSTEM, SO THERE IS ZERO CAPITAL OUTLAY. YOUR TEAM FOCUSES ON PRODUCTION, NOT ON FINANCING INFRASTRUCTURE.
THE RESULTS:
  • Price certainty on delivered heat without increasing operational costs
  • Scope 1 reduced
  • 24/7 reliability
  • No reliance on government subsidy
  • Integrates with existing processes
  • Partner with our team – over 50 years’ experience in power generation and industrial heat decarbonisation
BENEFITS UNDER A SINGLE HAAS CONTRACT
OFF-BALANCE-SHEET

Zero capital outlay. HeatShift funds, owns and operates the full system — your team focuses on production, not on financing infrastructure.

LOWEST-COST HEAT

Charging is optimised against low and negative power prices via long- term PPA resulting in heat at or below counterfactual.

24/7 RELIABILITY

Thermal storage decouples power intermittency from heat demand, completely.

SCOPE 1 REDUCED

Scope 1 carbon savings from day one — no green premium required.

NO POLICY DEPENDENCY

Market-driven economics — no subsidy and no governmenttimeline risk

FEASIBILITY TO OPERATIONS CAN BE ACHIEVED WITHIN 15 MONTHS

A low-resource, non-binding process to explore whether HeatShift fits your site.

6-12 WEEKS

INITIAL FEASIBILITY

• Heat demand & grid assessment
• Desktop planning review
• Letter of intent

3-6 MONTHS

PROJECT DEVELOPMENT

• Grid application & planning surveys
• Initial HaaS commercial discussions

3-6 MONTHS

DETAILED DESIGN

• Planning & grid secured
• HaaS terms agreed
• HeatShift FID

6-12 MONTHS

CONSTRUCTION

• HeatShift manages all construction
• Integrated around your production schedule
• Minimal disruption to offtaker with
commissioning programme to suit offtaker needs

25+ YEARS

OPERATIONS

• Optimised co-operation between parties
• Long-term alignment of incentives

LET’S START THE CONVERSATION.

A low-resource, non-binding process to explore whether HeatShift is right for your site.

INTRODUCTION CALL

Initial discussion between both parties.

SHARE INFORMATION

Gas demand data, equipment specs, waste heat recovery and electrical infrastructure details.

SITE VISIT & PROPOSAL

Arrange a visit to assess your facility — indicative commercial terms (price, volume and term) presented to the offtaker.

LETTER OF
INTENT

Non-binding HaaS supply agreement — minimal resource required.

No fees — just an informed conversation.

CONTACT US